Hull, MA Project
- Firestone .080 TPO membrane fully adhered
- 100 squares of flat roofing with all related flashings
EMERGENCY REPAIR, March 3rd, 2018, during a Nor’Easter on with intense winds as well as snow and rain conditions, (over the course of two days,) Corolla Roofing was able to mobilize and install approximately 6000 square feet of temporary roof that had roof that had been blow off resulting in insurance savings of tens of thousands of dollars as the roof was made weather tight before another storm arrived only days after the repair was completed.